Capital Marine Construction · EST. COCOA, FL LOGBOOK · BREVARD CO. STORM LINE321·432·0219 · 24 / 7
CM Capital Marine Construction Bill Thiel · Cocoa, FL
Logbook · Recent entries

What we built
this season.

A working selection of builds from the last 18 months. Every entry is a real Brevard County job, real permit number, real owner. Photos available on request.

Boathouse with a metal roof and rope-rail walkway
Entry · 01 Brevard County

Boathouse & walkway

Covered boathouse with a standing-seam metal roof, hardwood-tone decking and a rope-rail walkway out from the shoreline.

BOATHOUSE · DOCK · ROOF

Finished concrete seawall cap with the river beyond
Entry · 02 Brevard County

Concrete-cap seawall

New seawall cap run the full length of the lot, with the yard regraded and re-sodded behind it.

SEAWALL · CAP

Long fixed pier reaching a covered platform
Entry · 03 Brevard County

Long-run river pier

Fixed pier carried out over the shallows to a covered platform at the end, where the water is deep enough to use.

DOCK · PIER · COVERED PLATFORM

Vinyl sheet-pile seawall during installation
Entry · 04 Brevard County

Vinyl sheet-pile seawall

Vinyl sheet pile going in along a residential canal, with the waler in place ahead of the cap.

SEAWALL · NEW WALL

Boat raised on a lift under a shingle-roof boathouse
Entry · 05 Brevard County

Boathouse with boat lift

Shingle-roof boathouse over a single slip, with the boat up on its lift and a paver walk to the dock.

BOATHOUSE · LIFT

Curved waterfront deck with bent railing
Entry · 06 Brevard County

Curved deck & railing

Radius deck at the water’s edge with a custom bent top rail following the curve.

DOCK · DECK · RAILING

Field photography available on the site visit · 35 additional builds from the last 24 months on request

Want to be in the
next logbook entry?

Request a site visit Open the configurator